Execution Services

17/06/2016

PROFILE SPECIFICATION INTERIOR DESIGN PACKAGE

– The number of records including: 02 sets of engineering design construction A3

– The contents of each set, comprising the following components:

I. CONTENTS RECORDS SPACE INTERIOR DESIGN

  1. 3D interior perspective every room, every space
    Express visualization rooms after finishing the interior. Each room has 2 or more views
  1. Construction engineering ground floor interior
    Dimensions Artist positioning decorative elements, locate the interior furnishings, equipment, notes widgets symbols
  1. Ground floor and floor
    Tiles Style, slices; sizes, colors and types of materials
  1. Bare ground, the floor lamp decorated
    Ceilings and decorative way the room lights; represents the size of construction and positioning decorative lights
  1. The technical sections fitting
    Shown details of decorative area, the size of construction; notes, designated interior decoration materials
  1. Detailed drawings of the bathroom, toilet (if any),
    Paving way; sizes, colors and types of paving materials; layout of bathroom equipment – toilet
  1. The detailed drawings of stairs (if any)
    Included ground floor escalators, sectional ladder, ladder tiling details, details railings – handrails
  1. Detailed drawings door systems, glass walls, decorative iron spokes, curtain … (if applicable)
    Includes vertical, cross-sectional details of each door; feng shui represents the size, size workpiece erection; decorative iron details nan – protection; notes the complete specs
  1. Detailed drawings composed of Furniture
    Additional technical construction of interior furniture (tables, chairs, beds, cabinets, decorative items … or choose the type of equipment purchased items available)

II. CONTENTS PROFILE INTERIOR DESIGN ELECTRICAL

  1. Lighting power supply ground floors
    Express way wiring, location lighting lamps, arranged for each light switch
  1. Power level ground floors
    Express way wiring, position the socket, air conditioning, heater …
  1. Table synthetic materials and electrical equipment interior
    Statistic number, conductor cross-section, power equipment, materials and electrical equipment
  1. Cable ground floor communication (TV, internet, phone)
    Demonstrate how the wiring, connecting the top of the TV, internet, phone each floor
  1. Table synthetic materials communications cables throughout the home
    Statistics of conductors, equipment, materials and communications equipment
  1. Ground control cameras, smoke detectors, alarm … (if applicable)
    Shown for the layout, how the connection wiring devices

III. DESCRIPTION QUANTITY COST, COST INVESTMENT DECORATION

Table extract the amount of supplies, the total investment

Volume dissection supplies, the total investment of furnishing. This is the preliminary dissection table is not detailed construction cost estimates.